Issue
Context
A 220m² atrium, the heart of GreenBizz’s activity, suffered from strong sound reverberation due to its high ceiling height (10 meters) and its composition materials (raw concrete and glass), causing major acoustic discomfort.
Intervention
Audit, design, manufacturing, and installation of tailor-made acoustic absorption panels.